Sassnitz-Mukran, October 2, 2017 - A total of 76 kilometers of cable are on the way to the Mukran Port for a current offshore wind farm project. Between 9.4 and 23 kilometers long cables weighing between 510 and 580 tonnes will reach the port in five trains from the end of September to December 2017. Via the new track 66, the cables will be shunted by the port railway Baltic Port Rail Mukran (BPRM) to the quay and stored there before being later transshipped by the lay barge.